GroundFORCE Building Systems
How it works Heritage Contact

Introducing Permanent 2 Go

The foundation comes with it.

We build the entire structure — slab, frame, finishes — inside our Houston facility, then deliver it intact on air‑ride suspension. It's engineered for fifty years. It can still leave.

12′–0″ clear Post-tensioned slab Direction of travel

Modular has always meant temporary. This doesn't.

A conventional modular building arrives on a steel chassis or drops onto piers. Everyone who walks into it can tell. It reads as a stopgap — and then somehow stays fifteen years.

Permanent 2 Go is assembled in the opposite order. The concrete slab is cast and post-tensioned first, in our facility. The frame, envelope, mechanicals, and finishes are locked to that slab before the building ever moves. What leaves Houston isn't a box waiting for a foundation. It's a finished building that has never been separated from its own.

It meets or exceeds commercial and educational code and is engineered to stand for fifty years. And if the district redraws its boundaries, or the ground lease ends, or the need moves across town — it goes back on the rig.


Four steps, about 125 days.

01

Cast

The slab is poured flat in a climate-controlled bay and post-tensioned with high-strength steel cable. Tensioned concrete resists the flex that would crack a conventional slab, which is what lets the foundation double as a transport chassis.

02

Build

Framing, envelope, mechanicals, and finish work go on indoors — no weather delays, no material sitting in the rain, inspections on a predictable schedule. Everything ties structurally into the concrete so the building travels as one body.

03

Haul

The structure rides on pneumatic air-ride suspension, which absorbs the road shock a steel-spring rig would pass straight into the walls. Drywall seams, ceiling grid, and fixtures arrive the way they left the floor.

04

Set

Most sites need level grade or a stem-wall perimeter — not a crane pad and not weeks of disruption. The building is positioned, set down, and connected to utilities. Then it's open.

125 days

Or less, from order to occupancy

50+ years

Engineered service life, to commercial and educational code

12 feet

Clear interior height, delivered

50,000 sq ft

Climate-controlled manufacturing floor in Houston

We spent sixty years moving other people's buildings first.

Three generations of the Neatherlin family worked heavy structure moving out of Houston — the business of taking something enormous, fragile, and never designed to travel, and putting it somewhere else without harming it.

The family's favorite proof is a fully stocked convenience store that made the trip without spilling a drop of milk.

Kenneth Neatherlin founded GroundFORCE on the inversion of that job. If the hard part is moving a building that was never meant to move, then build one that was — and give it a real foundation while you're at it.

Bring us a site.

Tell us the footprint, the timeline, and whether the ground is yours for good. We'll tell you what we can deliver and when.

Start a conversation

GroundFORCE Building Systems · Houston, Texas